01 / Fit-out planning in Qatar

Find the right fit-out contractor in Qatar. Without calling and checking ten companies.

Describe your project once. We check licences, insurance and past work, and send you a shortlist of up to three matched contractors with indicative costs. Free for you.

  • Free for you
  • Up to 3 vetted contractors
  • Compare price, fit and start date
  • Reply within one working day
Get my shortlist ↗
Type of space
Finish level
250 m²
50 m²1,000 m²
Indicative office plan250 m²
Illustrative office floor planAn office with meeting room, workstations, reception and pantry. The drawing scales with the selected area. It is not a construction plan.MEETINGWORKSPACEPANTRYRECEPTIONCOLLABOFFICE21.27 m11.75 mNNOT TO SCALE
FIG. 01 / SPACE STUDYSTANDARD FINISH
Your office planning benchmark
QAR2,050,000

QAR 8,200 per m²

Benchmark, not a quote. Doha office basis.
Cushman & Wakefield Fit Out Cost Guide 2026.
All-in costs. Fixed planning conversion EUR 1 = QAR 4.2.

Get my shortlist

Takes about 3 minutes. No obligation.

Free for you

Contractors pay us.

A shortlist of up to three

Up to three vetted contractors, never ten.

One-page comparison

Licensed and checked.

Reply within one working day

A clear next step.

02 / Fewer dead ends

Finding the right fit-out contractor in Qatar is harder than it should be.

  • A list of companies does not tell you which one fits your scope.
  • Licence details, insurance and relevant work need checking.
  • The same project, explained again. And quotes with different inclusions.
  • Available when you need themA suitable contractor also needs capacity for your programme. We confirm availability before you see a name.
From scattered answers to a clear choice
Different scopeAre finishes and services included?
Unclear availabilityWho can meet your programme?
Missing evidenceWhich checks are complete?
Unclear exclusionsWhat will cost extra?
One brief. Up to three options.

Compare speciality, indicative cost, similar work and availability in the same format.

You decide who receives your details and who visits.

03 / From range to reality

A clear brief.
A real next step.

We reply within one working day. Your shortlist follows once the checks and any missing details are complete.

Illustrative project plans and material samples on a desk01 / SUBMIT

Describe your project

Takes about 3 minutes. Tell the project assistant about your space, budget and timeline. Plans and photos are welcome.

Illustrative qualification exchange
Is the space an empty shell or an existing office?
An empty shell in West Bay. We have the floor plan.
That helps us check the scope and contractor fit.
02 / CHECK AND SHORTLIST

We check and shortlist

We check licences, insurance, similar projects and availability. Only contractors who can start in your window make the shortlist. We ask for missing details by email or WhatsApp, then send a one-page comparison of up to three matched contractors.

Illustrative contractor inspecting a project space03 / SITE SURVEY

You choose who visits

The contractors you pick arrange a free site survey and quote. Approve up to three for comparable quotes. You decide whether to meet or appoint anyone.

Free for you. Contractors pay us for qualified introductions.

We qualify and match. We do not build. Your quote and construction contract come directly from the contractor.

04 / What you get

Your decision on one page.

Qatar Fit Out / Your project brief

Your office fit-out shortlist

Example

Sample document layout. These are empty comparison slots, not contractor profiles or completed checks.

Example layout for up to three contractor options
Checks and fitContractor AContractor BContractor C
SpecialityRelevant scopeRelevant scopeRelevant scope
Similar projectsEvidence to reviewEvidence to reviewEvidence to review
Indicative costScope-based indicationScope-based indicationScope-based indication
Earliest startAvailability to confirmAvailability to confirmAvailability to confirm
Site surveyDate to agreeDate to agreeDate to agree
Licence and CRCheck outcomeCheck outcomeCheck outcome
InsuranceCover and validityCover and validityCover and validity
StrengthReason for the matchReason for the matchReason for the match
Watch out forScope-specific questionsScope-specific questionsScope-specific questions

Your comparison explains scope fit and availability so you can decide who to meet.

What to ask in every quote

  1. Are the scope, materials and exclusions itemised?
  2. Who handles approvals, and what programme is proposed?
  3. Are payments tied to milestones, with warranties in writing?
Shortlist of up to 3 vetted contractors01 / 01

Ready to forward to your manager.

A clear basis for requesting formal quotes.

You only meet the contractors you choose.

Request formal quotes from your approved shortlist after site surveys. The one-pager contains indicative costs. If your policy requires three quotes, tell us in your brief so we can confirm availability.
05 / See the scope

From empty shell
to finished office.

Drag to explore an illustrative transformation. A fit-out turns a bare space into a working workplace.

Illustrative finished office with desks, lighting and glazed meeting roomsIllustrative empty shell before fit-outBEFORE / EMPTY SHELLAFTER / OFFICE

Illustrative visualisations, not a completed project by Qatar Fit Out.

PartitionsCeilingsLightingData cablingHVACFlooringJoineryFurniture
06 / Spaces we match

A different brief
for every space.

The right match starts with the type of work. Explore your project category.

What most people only check after it goes wrong

Hiring the wrong contractor costs more than time.

  • No valid trade licence or CR

    Your Civil Defence approval or landlord consent can stall.

  • No contractor all risk insurance

    Damage to the building can end up on your bill.

  • No written inclusions and exclusions

    Variations can push the budget far past the quote.

  • Payments not tied to progress

    You can pay ahead of work with nothing to fall back on.

We check all twelve points before a contractor reaches your shortlist.

08 / The budget, in perspective

Three finish levels.
A clearer starting point.

Doha office fit-out benchmarks. All-in costs per square metre, before your actual scope is priced.

01 / FINISH LEVELEssential02 / FINISH LEVELStandard03 / FINISH LEVELPremium
5,250QAR / m² · approximate8,200QAR / m² · approximate11,100QAR / m² · approximate

Benchmark, not a quote. Source Cushman & Wakefield Fit Out Cost Guide 2026, Doha. All-in figures include furniture, IT/AV, professional fees and contingency. Converted at EUR 1 = QAR 4.2. Finish labels and rounded QAR figures are our presentation of the source benchmarks.

Building condition, services, approvals and specification affect the final price. Office figures do not price retail, restaurant, reinstatement or villa work.

Explore the office fit-out cost guide ↗
Doha skyline in daylight
09 / Local spaces. Local contractors.

Projects across Doha, Lusail, The Pearl, Al Rayyan and Al Wakrah.

Are you a licensed fit-out contractor?

Receive qualified projects ↗

Who runs Qatar Fit Out

Qatar Fit Out is German-managed and independent. We don't build and we don't sell materials. Our job is to check contractors and make your decision easier. Contractors pay us for qualified introductions, which is why the service is free for you.

  • Independent, no contractor owns us
  • 12-point check before every shortlist
  • Your data goes only to the contractors you approve

Registered business details in our imprint.

Before you begin

A few fair
questions.

Is it really free?

Yes. Your project review, shortlist, one-page comparison and contractor site surveys are free for you. Contractors pay us for qualified introductions. You agree construction costs directly with your chosen contractor.

How many contractors will contact me?

Only the up to three you approve. We send your shortlist first. You choose who receives your details and who visits. We do not circulate your brief to a list of firms.

How do you check contractors?

We check trade licences and Commercial Registration, insurance, Civil Defence experience, references and completed work. Our public 12-point checklist also covers project teams, approvals, specifications, payment terms and handover. We check availability for your project.

Do I have to commit?

No. Receiving a shortlist does not commit you to a meeting or a contract. You decide whether to meet any of the contractors and whether to appoint anyone.

Who signs the contract?

You and your chosen contractor. They are responsible for the construction work under your contract. Qatar Fit Out qualifies projects and makes introductions. We do not carry out construction work or act as a party to your construction contract.

What if the best contractor is fully booked?

We confirm availability before we shortlist anyone. If a strong fit can only start later, we show it with the start date, so you can decide whether to wait.

What if none of them fits?

Tell us what does not fit. We review your brief and look again at no cost to you. You do not have to accept any of the options.

How long does a fit-out take?

Your contractor needs to confirm the programme after reviewing the scope. Design, approvals, procurement, construction and handover each need time. A change to building services or an occupied site can affect the sequence. See our office fit-out guide.

What do I need to prepare?

Have your floor plan or photos, approximate area, preferred start date and a rough budget idea ready. Plans and photos are welcome. If something is missing, submit what you know and we will ask for details on WhatsApp.

Do I need approvals?

Your scope may need landlord consent, Civil Defence approvals and, where applicable, municipal approvals through Baladiya. Ask your contractor to confirm the required approvals, who submits them and which fees are included before work begins. Explore our office fit-out guide.

What are Cat A and Cat B?

Cat A usually means the basic office finish, such as ceilings, floors and building services. Cat B adapts the space for your team with partitions, meeting rooms, workstations and finishes. Cat A and Cat B definitions vary, so agree the exact inclusions. Read more on our office fit-out page.

Which areas do you cover?

We qualify projects in Doha, Lusail, The Pearl, Al Rayyan, Al Wakrah and across Qatar. Share your location so we can check suitable contractors and availability.

What happens to my data?

We use your details to qualify your project and prepare your shortlist. Only the up to three contractors you explicitly approve receive your details. Our privacy approach follows Qatar’s Personal Data Privacy Protection Law (PDPPL). See the official PDPPL guidance and our Privacy policy.

Is the estimate a contractor quote?

No. The calculator multiplies the selected area by a rounded Doha office benchmark. Your actual scope needs a site survey and a written contractor quote. These office figures do not price other project types.

What should the contractor’s quote include?

Ask for the scope, materials, inclusions and exclusions, approvals responsibilities, payment milestones, proposed programme and warranties. Compare the same scope across your approved contractors before signing.

Illustrative fit-out work in progress
11 / Your next step

Put a real scope
behind the number.

Describe your project once. Get a shortlist of up to three vetted contractors and a one-page comparison. You choose who visits.

Get my shortlist Takes about 3 minutes. No obligation.

Qatar Fit Out

Automated project assistant

You are using an automated project assistant. Have your area, budget and required date ready. Takes about 3 minutes.

Let’s start with the space you are planning.
Tell us about your space
Project type
Location
Size of your space
Finish level
Budget and the date that matters
Total project budget in QAR

For reinstatement, use your lease end or handover month. We check availability against your required date.

Is this date fixed or flexible?
Why this date? (optional)
Plans and project details
Do you have plans available?

Upload a PDF or image up to 8 MB. Please remove private information unrelated to the work. You can send further files when we reply.

Who should we reply to?

The contractor checklist

12 checks before you sign.

Submit your email to download a copy. We use it to handle this request and do not sign you up for marketing.